Our Work

  • Quantity Surveying

    Kaitāia College, BB Block

    Stellar Projects provided Quantity Surveying services for the remediation of a 1990s classroom block at Kaitāia College, supporting delivery from detailed design through to final account, ensuring cost certainty, procurement rigour, and effective commercial management throughout the upgrade works.

    Stellar Projects   School
  • Quantity Surveying

    Northland Recovery Works (NRW)

    Stellar Projects provided Quantity Surveying services for a complex rail corridor restoration, managing evolving scope and costs across 51 sites. Robust commercial controls improved cost accuracy, delivered savings, and maintained programme certainty despite ongoing design development and construction challenges.

    Stellar Projects   Northland Recovery Works
  • 3 Waters

    Ports of Auckland Outfall Upgrade

    A New Zealand-first trenchless stormwater upgrade beneath Auckland’s waterfront has doubled CBD capacity, improved flood resilience, and enabled renewal of aging assets. Stellar Projects led engineering, management, and stakeholder coordination on this award-winning infrastructure project for future city growth.

    Stellar Projects   Ports of Auckland Outfall Upgrade
  • Transport, Quantity Surveying

    Loop Road South Construction – SH1 / SH15 Safety Improvements

    The Loop Road South Construction project delivers major safety upgrades at the SH1/SH15 intersection south of Whangārei. As Project Manager, Stellar Projects led bridge construction and complex ground improvements, enhancing safety, resilience, and efficiency for freight and regional traffic.

    Stellar Projects   Loop Rd South Construction
  • Transport

    Downtown Auckland Infrastructure Development Project (DIDP)

    The Downtown Infrastructure Development Project (DIDP) was one of Auckland’s most extensive urban redevelopment initiatives. Its goal was to enhance and future-proof the waterfront area, public transport facilities, and pedestrian pathways of the city.

    Stellar Projects   Taylor Street DIDP project
  • Transport

    City Rail Link (CRL) - Multiple roles across multiple disciplines over ten years

    City Rail Link is New Zealand’s largest transport infrastructure project. Over ten years, Stellar Projects contributed to 13 work packages, delivering end‑to‑end support and trusted outcomes across one of the country’s most complex urban builds.

    Stellar Projects   City Rail Link project   Albert Street
  • Transport

    Tīrau to Waiouru Rehabilitation Accelerated Programme (T2W)

    The Tīrau to Waiouru (T2W) project is a $150m accelerated SH1 maintenance programme. Stellar Projects provided MSQA and contract administration, supporting large‑scale pavement rehabilitation delivered through innovative full road closures to improve safety, quality, and delivery efficiency.

    Stellar Projects   Tīrau to Waiouru Rehabilitation Accelerated Programme
  • Transport

    DYNAMIC LANES IN AUCKLAND: Smarter use of existing roads

    Dynamic lanes are helping Auckland cut congestion by reallocating road space in real time. Case studies show major travel time savings, avoided construction costs and safety outcomes, demonstrating how flexible, technology-enabled lanes can deliver high-value transport improvements using existing infrastructure.

    Stellar Projects   Article   Dynamic lanes
  • Transport, Quantity Surveying

    Mangamuka Gorge Slip Repair

    Following extreme weather damage to State Highway 1, Stellar Projects supported NZ Transport Agency Waka Kotahi to deliver complex landslip repairs through Mangamuka Gorge—providing project, cost, and contract management to restore a safer, more resilient transport lifeline for Northland communities.

    Stellar Projects   Mangamuka Gorge Slip Repair
  • 3 Waters

    Stormwater Network Renewals - Glen Innes & Pukekohe

    This project delivered targeted stormwater culvert renewals at two Auckland locations, improving network reliability and resilience. Stellar Projects provided contract administration, quality assurance, and construction oversight, successfully managing changing ground conditions, access constraints, and stakeholder requirements on behalf of Auckland Council.

    Stellar Projects   Station Road and Line Road
  • Delivering Complex Infrastructure with Confidence

    CONTACT US TODAY