Kaitāia College, BB Block
Stellar Projects provided Quantity Surveying services for the remediation of a 1990s classroom block at Kaitāia College, supporting delivery from detailed design through to final account, ensuring cost certainty, procurement rigour, and effective commercial management throughout the upgrade works.
Northland Recovery Works (NRW)
Stellar Projects provided Quantity Surveying services for a complex rail corridor restoration, managing evolving scope and costs across 51 sites. Robust commercial controls improved cost accuracy, delivered savings, and maintained programme certainty despite ongoing design development and construction challenges.
Ports of Auckland Outfall Upgrade
A New Zealand-first trenchless stormwater upgrade beneath Auckland’s waterfront has doubled CBD capacity, improved flood resilience, and enabled renewal of aging assets. Stellar Projects led engineering, management, and stakeholder coordination on this award-winning infrastructure project for future city growth.
Loop Road South Construction – SH1 / SH15 Safety Improvements
The Loop Road South Construction project delivers major safety upgrades at the SH1/SH15 intersection south of Whangārei. As Project Manager, Stellar Projects led bridge construction and complex ground improvements, enhancing safety, resilience, and efficiency for freight and regional traffic.
Downtown Auckland Infrastructure Development Project (DIDP)
The Downtown Infrastructure Development Project (DIDP) was one of Auckland’s most extensive urban redevelopment initiatives. Its goal was to enhance and future-proof the waterfront area, public transport facilities, and pedestrian pathways of the city.
City Rail Link (CRL) - Multiple roles across multiple disciplines over ten years
City Rail Link is New Zealand’s largest transport infrastructure project. Over ten years, Stellar Projects contributed to 13 work packages, delivering end‑to‑end support and trusted outcomes across one of the country’s most complex urban builds.
Tīrau to Waiouru Rehabilitation Accelerated Programme (T2W)
The Tīrau to Waiouru (T2W) project is a $150m accelerated SH1 maintenance programme. Stellar Projects provided MSQA and contract administration, supporting large‑scale pavement rehabilitation delivered through innovative full road closures to improve safety, quality, and delivery efficiency.
DYNAMIC LANES IN AUCKLAND: Smarter use of existing roads
Dynamic lanes are helping Auckland cut congestion by reallocating road space in real time. Case studies show major travel time savings, avoided construction costs and safety outcomes, demonstrating how flexible, technology-enabled lanes can deliver high-value transport improvements using existing infrastructure.
Mangamuka Gorge Slip Repair
Following extreme weather damage to State Highway 1, Stellar Projects supported NZ Transport Agency Waka Kotahi to deliver complex landslip repairs through Mangamuka Gorge—providing project, cost, and contract management to restore a safer, more resilient transport lifeline for Northland communities.
Stormwater Network Renewals - Glen Innes & Pukekohe
This project delivered targeted stormwater culvert renewals at two Auckland locations, improving network reliability and resilience. Stellar Projects provided contract administration, quality assurance, and construction oversight, successfully managing changing ground conditions, access constraints, and stakeholder requirements on behalf of Auckland Council.